top of page

SALEEM JALIL DESIGN

Sheikh Zayed Bridge

In Collaboration with Zaha Hadid  

Shaping the way forward

Following a failed competition to find a suitable 3rd bridge crossing from the mainland to Abu Dhabi island, we were approached to develop new bridge ideas. A bridge at the mouth of the creek connects an existing highway to the airport and beyond and a new feeder road to downtown. 

The new bridge at the mouth of the creek. is 842m long and is composed of three main arches sup-ported by four piers and two additional sets of supports, or feet, on the Abu Dhabi island side. The main span is 140m (460 ft) wide.

Client

In collaboration with Zaha Hadid

Budget

Undisclosed

Location

 Abu Dhabi, UAE  |  2010

Bridging the gap

The 68m (223 ft) wide roadway became the third traffic route from the mainland to Abu Dhabi and was designed to carry 16,000 vehicles an hour on two four-lane carriageways. It also includes emer-gency lanes in each direction and a pedestrian footway. The largest arch towers 63m (206 ft) above the bridge deck.

Connection

Shape the way forward

Travel in style

Sheikh Zayed Bridge.png

Through design you can shape how people experience the world 

Saleem A Jalil

Book a Free Consultations

Type of Project
Residential
Commercial Property
What stage of the build
Pre-build (plot)
Build (planning permission)
Build (consulting and design options)
Screenshot 2024-06-27 at 15.26.42.png

Sheikh Zayed Bridge

bottom of page